Grasberg's recovery is pushing Freeport to trim near-term forecasts
By Siam Sukkhee Trading Co., Ltd — 2026-10-29 — Bing News — copper price Asia
Freeport knocked down its copper sales target this week. Not by much, but enough to matter to anyone watching the commodity cycle.
The company now expects to ship three billion pounds of copper in 2026, versus 3.1 billion it projected back in July. For 2027, they're guiding to 3.7 billion instead of 3.8. Small moves, numerically. But they signal something more interesting happening at Grasberg, Freeport's underground operation in Indonesia that's still coming back online after a mudslide killed workers in September 2025.
The revisions came because of two separate drags. Lower production in the US faced extreme weather that cut operating rates. Chile's El Abra mine had slope management issues that restricted access to the better ore. Cerro Verde in Peru, meanwhile, outperformed forecast—a reminder that weather and geology don't care about your guidance.
What actually matters here is the margin story. Freeport's third quarter showed net income of $1.17 billion, compared with $674 million a year prior. Revenue climbed eight percent to $7.55 billion. The company sold less copper than it did quarterly a year ago—749 million pounds against 977 million—yet generated far more profit. That's what happens when your realized copper price rises from $4.68 a pound to $6.54.
Actually, that's not quite right. Better to say: that's what happens when you sell less volume at a much higher price and you've got your cost structure under control. Unit net cash costs rose to $2.07 per pound from $1.40, a significant jump, but the market for copper ran even faster.
The Grasberg ramp-up is the thing everyone's watching. Mining rates at the Block Cave underground operation averaged 70,000 tonnes daily in Q3, up from 53,000 in Q2. Material-handling upgrades are on schedule for early next year. Production Block 1S should restart around mid-2027. Freeport expects the operation at full capacity by year-end 2027.
Dry weather helped get the ore moving, though limited water availability has complicated milling rates. For now, the company says the impact remains manageable. Analysts at BMO Capital Markets describe the ramp-up as increasingly de-risked, which is the kind of phrase that means people in the room are no longer losing sleep over it.
There's a complication brewing on the cost side. Freeport now expects capital spending of $4.4 billion this year and $5.2 billion next, above the $4.3 and $4.8 guidance from July. A chunk of that premium reflects additional mining equipment and inflation in the US, where the company is eyeing an expansion at its Bagdad mine that could take three to four years and cost $4.5 billion. If built, it would add 200 to 250 million pounds of annual copper output.
The company's holding back on calling it approved—the decision lands this quarter—but the investment thesis is clear. Copper demand will keep rising. The structural tailwinds are real. Grasberg will produce. And for a company that actually delivers volumes into a tight market, the returns look profitable enough to build on.
Source: "Freeport-McMoRan (NYSE: FCX) cut its copper sales forecasts for this year and next while reaffirming the recovery timetable for its Grasberg operation in Indonesia." — The Northern Miner
Tags: copper cathode trading Asia